Runoff Source Areas
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
Commercial & institutional resilience
Review grades, inlets, roof discharge, storage, conveyance, overflow routes and maintenance at Ontario commercial sites.
The practical answer
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
System view
Each area needs a defined purpose, owner, evidence trail and review cycle.
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
Guidance 1
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
For this topic, the organization should collect current grading and servicing information. The decision should be recorded with the responsible owner, evidence used, limitations, review date and any need for qualified technical, legal, insurance or municipal advice.
Commercial resilience depends on connected decisions. Building systems, site drainage, occupancy, maintenance, emergency response, continuity and capital planning should not be evaluated as isolated programmes.
Guidance 2
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
For this topic, the organization should trace roof and surface drainage. The decision should be recorded with the responsible owner, evidence used, limitations, review date and any need for qualified technical, legal, insurance or municipal advice.
Commercial resilience depends on connected decisions. Building systems, site drainage, occupancy, maintenance, emergency response, continuity and capital planning should not be evaluated as isolated programmes.
Guidance 3
Roofs, pavement, landscaping, loading areas, snow storage and private drainage operate as one site system. The review should identify intended routes, blockages, low points, overflow behaviour and downstream consequences.
For this topic, the organization should inspect low points, catch basins and outlets. The decision should be recorded with the responsible owner, evidence used, limitations, review date and any need for qualified technical, legal, insurance or municipal advice.
Commercial resilience depends on connected decisions. Building systems, site drainage, occupancy, maintenance, emergency response, continuity and capital planning should not be evaluated as isolated programmes.
Implementation workflow
A useful commercial workflow identifies decisions, accountabilities and verification rather than producing an isolated report.
Assign an accountable owner, document the evidence and define what completion and verification will look like.
Assign an accountable owner, document the evidence and define what completion and verification will look like.
Assign an accountable owner, document the evidence and define what completion and verification will look like.
Assign an accountable owner, document the evidence and define what completion and verification will look like.
Assign an accountable owner, document the evidence and define what completion and verification will look like.
Assign an accountable owner, document the evidence and define what completion and verification will look like.
Readiness check
Selections are stored only in this browser session and are not submitted to RSM.
Common failure points
Connected pathways
Frequently asked questions
No. Some systems store water temporarily, but depth, duration, location and overflow need to be understood.
Maintenance and design are different scopes; changes may require professional design and municipal approval.
Yes, because they can share receiving systems and low points.
No. RSM provides education and pathways, not engineering or municipal approval.
Official source basis
RSM summarizes concepts for education. Confirm design, legal, insurance, code, permit, funding and emergency requirements with the responsible authority or qualified professional.
Next step
Connect the building, site, people, records and investment decisions through one accountable pathway.
Published: July 19, 2026 Last reviewed: July 19, 2026
Prepared by Regional Stormwater Management for public and professional education. RSM does not certify buildings, guarantee flood prevention, determine insurance coverage or replace engineering, legal, municipal or emergency advice.
Next steps
Connect this topic to assessment, planning, maintenance and organizational learning.